We are pleased to inform you that the reconstruction of the power line 110 kV Wirek – Halemba 1 and Wirek – Halemba 2 is entering the next stage. The works carried out by #AltergaTeam are progressing according to the assumed plan:
- we have made a monolithic foundation for power pole 32 and placed foundations for structures in bays 21 and 22
- we have installed structures for heads along with the foundation of the cable pole
- we have laid a double-track cable line between pole 32 and bays 21 and 22
- we have dismantled the old cables and structures of pole 32
- we have suspended new overhead line cables on section 31-32
We continue to work efficiently, implementing the next stages of the project, including the construction of the R110k technological road – pole 32 and measurements of the cable line and works on its backfill.